2,300 new pallet positions in three weeks

The brief

GPC needed more storage capacity at their Melbourne distribution centre, without losing the racking that was already working for them. That meant a project with several moving parts: clearing out racking that had reached the end of its useful layout, installing new capacity, reworking and repairing what stayed.

Our approach

We began with a requirement meeting with GPC’s Systems & Inventory Manager, followed by a site survey of the Melbourne DC. Our design team then prepared the drawings and sent them through for review.

During design, GPC refined their layout. Because the drawings were developed in close consultation with them, we could adjust quickly and keep the project moving.

Once the quote was accepted, we ran a site meeting with GPC’s HSE Advisor and our installation partner, MM Industrial. The aim was to agree on exactly how we would deliver the project within GPC’s site requirements and expectations, before any work started.

What we delivered

  • Removal of existing racking
  • Supply and installation of 2,300 pallet positions
  • 200 high level pick locations
  • Reconfiguration of existing racking
  • On-site racking repairs

Words from our client

“We came to Absolute Storage needing a solution that could handle a diverse range of products of all shapes and sizes. A standard, cookie-cutter system wouldn’t have sufficed. 
The team took the time to understand our requirements and worked with us to develop a tailored system built around how we operate.
The result has alleviated our storage pressures, freed up valuable space, and improved both safety and productivity across the shed. From design through to implementation, the process was seamless. Communication was clear, timelines were met, and the quality of the work was solid throughout.”

Planning a racking upgrade?

Talk to the Absolute Storage Systems team about your next project.

Explore our Projects

Request Your Free Racking Audit

As per the Australian Standard (AS4084:2023), pallet racking audits are now mandatory and must be completed every 12 months.

Ensure your facility is safe and fully compliant with a free onsite audit from our expert team.

Contact Information
Warehouse Information
Estimated Number of Pallets